Kingery Expressway Reconstruction

Provided construction engineering services for the three-year reconstruction program, including the reconstruction of the interchange of two major expressways with directional flyover ramps, separated into six different contracts.

Work included inspection of the placement of embankment for future structure work, inspection of bridge and pavement removal and replacement, construction of four retaining walls, a cross-road box culvert, and seven bridges.

Maintenance of traffic was a significant part of this reconstruction.