Jane Addams Memorial Tollway (I-90) Master Plan | Illinois Tollway

As part of a corridor-wide Project Master Plan of the Jane Addams Memorial Tollway, Knight provided planning services for the proposed rehabilitation and addition of lanes on a seven mile stretch of the Tollway between Higgins Road and the Elgin Plaza. Project work included roadway and bridge rehabilitation and widening, interchange ramp modifications, drainage, environmental integration, traffic analysis and structure improvements. The project required extensive coordination with Metra as well as several other stakeholders including the FHWA, Cook and Kane counties, several municipalities and permitting agencies.

Engineering Services Provided:

  • Master Planning
  • Expressway Design
  • Feasibility Study
  • Location Drainage Study
  • Environmental Engineering
  • Roadway Widening
  • Structural Rehabilitation